Our Pro­jects

Pro­jects in medi­um vol­ta­ge

Our bat­tery sto­rage pro­jects are con­nec­ted to the medi­um-vol­ta­ge grid (20,000 volts) to ensu­re relia­ble and effi­ci­ent local ener­gy sup­p­ly. The­se sys­tems are desi­gned as “two-hour sto­rage units” and are used for sys­tem ser­vices such as pri­ma­ry con­trol reser­ve, as well as for opti­mi­sa­ti­on on the spot mar­ket and the reduc­tion of grid fees. The imple­men­ta­ti­on of such pro­jects is essen­ti­al for the sus­tainable and cost-effec­ti­ve use of rene­wa­ble ener­gy.

Pro­jects in high vol­ta­ge

Our high-vol­ta­ge pro­jects are cha­rac­te­ri­sed by a signi­fi­cant­ly lar­ger land requi­re­ment and requi­re con­nec­tion to high-vol­ta­ge lines. For the­se lar­ge-sca­le bat­tery sto­rage pro­jects, the con­s­truc­tion of a dedi­ca­ted sub­sta­ti­on is neces­sa­ry to ensu­re con­nec­tion to the high-vol­ta­ge grid. Due to the exten­si­ve infra­struc­tu­re mea­su­res invol­ved, the imple­men­ta­ti­on peri­od for high-vol­ta­ge pro­jects is con­sider­a­b­ly lon­ger. The­se pro­jects make a cru­cial con­tri­bu­ti­on to the sta­bi­li­ty and effi­ci­en­cy of the regio­nal power grid and sup­port the sus­tainable inte­gra­ti­on of rene­wa­ble ener­gy.

BESS Alpha
15,5 MW / 50 MWh

Rea­dy to build

BESS Beta
80 MW / 320 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se

BESS Gam­ma
60 MW / 240 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se

BESS Del­ta
60 MW / 240 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se

BESS Epsi­lon
12 MW / 48 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se

BESS Zeta
12 MW / 48 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se

BESS Eta
21 MW / 84 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se

BESS The­ta
60 MW / 240 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se

BESS Iota
100MW / 400 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se

Click Here
BESS Kap­pa
90 MW / 360 MWh

Grid con­nec­tion secu­red / In the buil­ding per­mit pha­se